Professional, rigorous and honest. TOP, a reliable brand for you.

Abide by "customer first, integrity based, pursuit of perfection, team win-win" corporate values

Service support

TOP
All categories

Help center

TOP is committed to providing customers high-quality products and perfect service system, guarantee the safety of people, environment and property.

Question online
LISTEN TO THE VOICE OF EVERY CUSTOMER

在线提问

意向信息

意向信息

联系信息

联系信息
TOP

 Question list

 

THESE MATERIALS HOPE TO HELP YOU

Ask

How to inspection and maintenance for TSF-400

Answer

Inspection and maintenance plans include all operations that must be completed by the user.

The specified frequency is the minimum standard, and the frequency can be increased as per requirement.

 

Terms Week Month Year
15.1 Check hose connections if well sealed.    
15.2 Check sieving house if any leakage.    
15.3 Clean sieving house (cover, base, mesh, funnel).    
15.4 Check mesh seal gasket, replace it if broken.    
15.5 Adjust the clamp if loosen.    
15.6 Check HEPA filter if any leakage.    
15.7 Check the sealing gasket between the base and frame, replace it if damaged.    
15.8 Check thread and welding point if any damaged.    

15.9 Check the cable if any broken

   

 

 

Previous page
1
这是描述信息
Search
submit
cancel
Direct Industry

Direct Industry

Alibaba

Alibaba

Hotline

E-mail:info@iectop.com

Copyright © 2020 iectop.com 浙ICP备15026518号-1 Powered by 300.cn 

Contact us

Username used for comment:
在线留言
Description:

在线留言